Posts Tagged ‘trains’

RIP 01

The RIP track on the Southside Industrial District

A great space saving “industry” for a small model railroad, a RIP track is a fun way to cram a lot of action into a compact area.

“RIP” stands for Repair In Place and is the area designated by the real railroads to do light maintenance without having to haul rolling stock back to the main car shops. Typically, they are adjacent to yards, but they can be located anywhere traffic volume or operations warrant it.

RIP 02

The RIP track sits on on the edge of the District with businesses in the background.

I think RIP tracks make great modeling subjects for several reasons. First, they don’t demand a lot of trackage. As few as two car spots is suffucient to get some traffic movement during an operating session. Second, they don’t require a large structures or real estate and can fit in any shaped area or corner. Third, since all equipment eventually wears down and needs repairs, literally any type of car or motive power can be spotted there. Finally, the open-air maintenance facilities are ripe for modeling those rough and tough details.

RIP 03

An out of service caboose functions as an office and crew hangout

The RIP track on my own Southside Industrial District is right at the front of the layout and doubles as the on-set staging for operating sessions. An out of service caboose is used as the office. The RIP track has a crane, spare equipment, and junk strewn about making a nice detail scene for visitors to focus in on. If I ever want to operate the module as part of a larger layout, I can remove the crane and use the front track as a mainline for through traffic.

RIP 04

The RIP track is a hive of activity and the source of some great modeling opportunities.

I enjoy swapping out maintenance-of-way equipment as I acquire new pieces and look forward to seeing what colorful rolling stock will be set out for repairs.

RIP 05

A gondola sits waiting for service on the RIP track at the end of the line on the Southside Industrial District

ops 01 crop

I sit all day in front of a computer at work. The last thing I want to do when I get home and head to the basement is to do a bunch of paper work because “it feels more prototypical”.

I participate in my hobby because I enjoy it and it is a change from what I do all day long. And I won’t apologize for keeping it simple and having fun. I have two goals for when it comes time to run trains on my small industrial switching layout. First, I want some form of structure and second, I try to keep it as simple as possible.

track plan for industrial switching layout

Southside Industrial District trackplan

A little bit of order goes a long way when running a small layout. The task of simulating the movement of products rolling on two rails of steel is called operations and shouldn’t need an advanced college degree in order to be enjoyed.

The literature on operating a model railroad is plentiful and I won’t review it here. Without a continuous run option, switching layouts like the Southside Industrial District need an operating scheme to get things moving.

CTC Texax

Sitting at a dispatcher’s desk shuffling papers is not my idea of fun after a long day at the office photo: Robert Yarnall Richie, DeGolyer Library, Southern Methodist University

Car cards and waybills are a popular option (see Model Railroader’s operating session for the Winston-Salem Southbound project layout), but for me, even that is too much work.

I operate almost exclusively solo, and occasionally with a friend. I want to walk into the train room and start running trains with very little setup. And if I’m explaining to a friend who has never held a throttle, I want to be able to do it in less than ten minutes.

For car forwarding, I’ve settled on a system called modified wheel reports. The system is simple, flexible, and can be as expanded as desired.

ops 3a

Without space for an adjacent staging yard, my freight car storage is a disconnected table-top and chairs with no turnouts or wiring. Cars are selected from here based on a wheel report card and moved by hand to the RIP track on the layout. You could do away with the track all together or switch cars in a proper operating yard and drive the train to the area to be worked.

The basic principle is that there is 1 card per train (I use 3”x5”) which lists how many of each freight car type are delivered to each industry. Any car will do and there is no need to track individual reporting numbers. Pickups are optional unless the space is needed for a drop off. The local train crew decides how the cars should be switched.

That’s pretty much it. Of course there are some details that come into play on each pike. Let’s see how it plays out on my particular model railroad – the Southside Industrial District.

The Layout

The Southside Industrial District is a 30”x88” HO scale industrial switching layout set in the present day. I run one switcher with modern cars along with some older 40-foot equipment. The track configuration is loosely based on John Allen’s Timesaver with a run-around track and six spurs plus a RIP track. There is no fiddle yard attached, so I use on-set staging on the RIP track at the front left portion of the layout.

The Industries

I have six spur tracks that can receive cars: one each for National Transfer and Storage, Sylvan Foods, and Ames, as well as 3 tracks for DuPont. Each DuPont track is considered a single “industry”.

ops 02

Each industry can technically receive any type of car, but I try to keep it fairly realistic to simulate the flow of raw materials and finished product. The tool company doesn’t get reefers and toxic chemicals don’t get dropped off inside the dry storage. When I designed my layout, I planned for a set of industries that could receive a mix of types of rolling stock. Also, there is no movement of cars directly from one industry to another – all car movements originate and terminate at other industries off-stage via an unconnected staging yard.

The Cards

Cards are created in a grid format with industries down the left side and car types across the top. You could use official AAR car designations or make up your own like I did. The cells hold the total number of cars of that type for that specific industry. Add up all the cells and that is how many cars are in the train. You can create the cards right before each session (they literally take just seconds), or have a pre-made stack to draw from.

ops 03

The Setup

To start, the train master or conductor picks one of the pre-made cards, then selects the number of cars for each type and places them on the RIP track in any order.

In the photo you can see a wheel report with the cars marked to be set out and the total number of cars circled in the bottom corner. Cherry picking IS allowed. Pick your favorite or most colorful car. Enlist the help of youngsters and have them choose some cars.

A single locomotive is placed in a starting position. I use the run-around track in front of the “Southside Industrial” sign as a sort of home base for my loco.

ops 05 crop

The Play

Crews consist of one or two members. Once the setup is complete, the crew first decides the actual location of the drops, as well as any pickups. For example, the train might have two boxcars to set out  – one for Ames and one for DuPont. The conductor can select either car to go to either industry, it doesn’t matter. If that spur is full, at least one car (any type) must be removed to make space for the new car.

There is no writing. Everything is done from memory. With only a few cars to move, it is not difficult to keep track of.

Then the crew gets busy actually switching the cars.  Pickups are placed back on the RIP track in any order to make a return train. The motive power is returned to its original position. These cars are removed from the layout by the old “hand of God” 0-5-0 switcher method before the start of the next sequence. Refreshments at the Third Street Deli soon follow.

That’s all there is to it.

This is a single sequence. With the on-stage fiddle track cleared, more sequences can be strung together for a longer operating session.

ops 08

Enhancements

If you want more of a challenge or your operators have more advanced skills, you can always tighten some of the rules to your desire. For example, you could simulate unloading of freight by having removable loads or require “sure” spots at loading doors for specific types of cars. Increasing the number cars as well as their length also increases the difficulty level. The good thing about this system is that you can start simple and add as much complexity as you want.

If your module is part of a larger layout, you can still put wheel reports to good use. Instead of specific industries on the wheel report card, industries get replaced by towns along the line. The crew still decides locally at each stop which cars to switch at what destinations. Your train will be longer and you can have a separate crew make up and break down trains in the yard with actual switching instead of using a fiddle yard.

Remember, wheel reports are for organizing the movement of individual freight cars, not entire trains. Depending on the size of your layout, you may want to combine the wheel reports (or whichever car forwarding system you decide on) with a method of systematically tracking train movements. As my layout grows, I plan on scheduling series of train movements with sequence lists.

So that is my version of what I call wheel reports. A small layout doesn’t need a complex system to make it run in an orderly fashion. If I want a quick 10 minute session, or if I’m giving a primer on the basics of model railroad operations, wheel reports fit the bill. In no time you can be moving some serious freight around your miniature empire, no matter how large or small. So, if you’ve been considering adding operations to your layout but have been hesitant to take the plunge, give wheel reports a try.

WheelReportsVSCarCards

I finally got around to making a track plan for my Southside Industrial District model railroad.

track plan for industrial switching layout

Southside Industrial District trackplan

I made one several years ago with Atlas Right Track software. The program was free then, but it looks like it has been replace with a pay version now.

I dug around in my old files and was able to find a jpg export of the original plan, so that is where I started.

SIDX_AtlasRightTrack

The Southside Industrial District as produced by Atlas software program

I imported that into a graphics manipulation tool and just used the Atlas plan as a base, doing most of the drawing free hand. Converting the snap track to single lines streamlined the plan and made it less clunky. I added several layers of ground, ballast, building, titles, and even trees. By using layers, I can hide different aspects of the plan for different purposes.

I think I didn’t come out half bad for my first attempt. I can now include the plan when describing various things in articles on my blog.

When I made the original track plan with the Atlas software, I also made a few other modules of different shapes and sizes. I printed those out and glued them onto some card stock and can move them around like puzzle pieces when planning updates and extensions to the layout to get a better feel of how things go together.

urban_trackplanning

Planning a layout using different configurations of modules built with the Atlas Right Track software.

 

 

I found some pictures of my first three layouts I built as a young lad growing up. As far as I can tell, the earliest is from 1977 or before, all the way up to what my last layout looked like in about 1986 before I dismantled it sometime around 1991.

flashback 01

The plywood pacific loop I inherited from my brother. I tried to break up the monotony by adding some land forms. Circa 1977

flashback 03

The Plywood Pacific first layout. Note the kinked 15″ radius track. Yes, that is a Tyco F7 on the elevated track. 1977

flashback 04

Layout #2 based on Linn Westcott’s HO Railroad That Grows. It joins a revamp of Layout #1 at 90 degrees. Circa 1979

flashback 05

Skills and techniques continue to improve with layout #2 based on the book HO Railroad That Grows. About 1979

flashback 07

A diorama or staging table built for photography, circa 1980.

flashback 08

The start of model railroad empire #3. Starting to use more pro techniques – open grid benchwork with risers, broad curves, #6 mainline turnouts, double ended yard, and block cab control able to run 3 trains. Circa 1982

flashback 09

Layout #3 with foam scenery, separate mainline and yard control panels, and a loads/empties in/out industry combination with the coal mine and power plant. All rolling stock equipped with Kadee couplers. Craftsman, kitbashed, and custom built kits. Several kits and all rolling stock still in use today. Circa 1986

flashback 11

Layout #3 with the freight yard in bottom right. 1986

flashback 13

Layout #3 in its most complete form. 12’x12′ HO scale. 1986

workbench 20190624

A quick coat of paint and some decals update this Chessie Bachmann GP40 just like the prototype

It may seems like I’m not making any visible progress on the Southside Industrial District model railroad, but there is a lot going on behind the scenes.

I’ve decided to put a “bookazine” together of my blog entries about the small switching layout, so I’ve been going back several years to 2011 and gathering all the resources and putting them together. The early articles I just wrote as blog entries – not to be put in print – and there was a lack of photos that accompanied them.

Also, the railroad is more complete now and I can show finished “after” scenes which just looks better.

Any modelling I’ve done, is to fill in gaps for photography or illustration purposes.

The Southside is in CSX country, but I had not one locomotive so designated – all of them are Chessie System models literally from the 80’s. But I did have some extra shells, so I painted one up over a weekend to place in pictures.

It was a quick and dirty job: the blue striping isn’t quite right and I only put decals on one side. Also for now there is no glass in the cab windows. I just wanted something to place on the background in the layout to give a rough sense of time and place.

DuPont pickup 20190624

A GP35 still wearing Chessie System colors pulls a well car out of DuPont shipping track #5 on the Southside Industrial District

So, I’ve been detailing as well as going back and cleaning up and augmenting previous articles. Also, an article on operations is in the making and on the way.

I’m finding out that making a book of even previously written material is a lot of work, but I think it will be worth it to save and reflect on the best portions of my experience.

 

 

Modeling the other side of the tracks need not send you to the poor house
hardtimes00

Simple details help set the scene on the Southside Industrial District HO scale switching model railroad

When you model the rough side of town, there are some businesses you might consider representing. I’ve chosen to include three on the backside of my layout. Commerce Street includes a car title loan business, a soup kitchen, and an abandoned apartment building. These buildings have been mostly cobbled together from extra parts and lived as glorified mock-ups in the background of my layout for a few years now. It was time to add some window glass, signs, and details to give these shops some character.

hardtimes01b

The TitleMax building is painted a dark color with modern signage and placed on a back alley

TitleMax
Every depressed section of town needs a payday pawn shop. The source material for this shop came from an eBay lot that including what I finally identified as a Wathers Wallschlager’s Dealership. It is literally on a back alley on my pike, so I painted it a dark brown with no mortar to keep it simple and in the shadows. Other than that, I basically just added some signs from the internet, with some on the inside of the windows looking outward.

hardtimes01a

Some left over wall pieces and a cardboard roof covered with sandpaper make the TitleMax building

hardtimes02

Simple details help the TitleMax building blend into the background in this alley scene on the HO scale Southside Industrial District

City Mission
This building is a deconstruction of the Art Curren “A. Frugill Co.” from a magazine article in the 1980’s. I originally built the building per the article’s instructions, but it wouldn’t fit on the current switching layout, so I took it apart and made two buildings out of it. The other building is a camping supply store on the front of the layout. Again, I didn’t have to do much more than add some window glazing, signs, graffiti, and clutter to the front of the building to turn this into a downtown soup kitchen. When searching for logos, I found a nice clear billboard, so I added that to the roof.

hardtimes01

An Art Curren kitbash from the 1980’s gets re-purposed as the Salvation Army city mission soup kitchen

Greenmont Apartments
This, too, is a leftover from an Art Curren project. I bought 3 of the Life-Like apartment buildings for his “Flatt Iron Co.” project the I ended up not building it and using two of the kits for Silvan Foods. The final kit I used for the Greenmont Apartments. I wanted to get some extra height beyond the three stories, so I added a half story basement from the Life-Like factory, which is the same size. I also used the backs of the three stories to create another story on top. I again choose a simple, dark paint color to keep the building non-assuming in the background.

hardtimes07

The Life-Like Belvedere hotel is used to model the back of an abandoned apartment building

The added height of the ground floor posed a problem with access to the front door. I eventually found some stairs in a junk box, but there was still not enough room to reasonably come out to the sidewalk. So, I rotated the stairs 90 degrees and left them a bit short of reaching the entrance. I decided this would be the abandoned backside of the building and the main entrance would remain unmodeled on the other side. It seems to work.

hardtimes04

Left: The back of each story was removed and used to create a fourth story. Wall sections from another Life-Like kit were used to make a split basement and give more height. Right: Boarded up windows, broken glass, screen mesh, and graffiti all contribute to making Greenmont Apartments feel abandoned.

I also wanted to add some tell-tale signs of an abandoned building. I used a few different modeling devices to achieve this. I boarded up some windows and doors, both from the inside and outside. Other windows were covered with screen mesh. Still other windows were broken, or left with no glazing at all. I added a few awnings, but not on every window. Everything was weathered with dry brushing, washes, and powders. Some graffiti and event posters can be found near the street level. A couple of construction workers sit on the steps eating their lunch, while a pick-up basketball game has started near by.

hardtimes05

More graffiti and event posters on the side of Greenmont Apartments. A basketball hoop will be added later.

These building were really cheap to do. They were mostly leftover walls and items from the scrap box, but even the complete structures I bought would be considered budget purchases. It is amazing what a few signs can do and just goes to show that you don’t need to spend a lot of money to give your town a bit of that “lived in” character.

Windows, signs, and details help a background building blend in
DG01

Homemade signs and scrap box pieces bring an old downtown store front into the 21st century on the Southside Industrial District HO scale switching layout

All across the country, Main Street is coming back to life. Turn-of-the-century buildings are being renovated by boutiques as well as the big national chains seeking that homey feeling. It is not different down on the Southside, where model kits meant for the transition era are being brought into the 21st century.

The Southside Industrial District is a modern era industrial switching layout set in an office park on the what is now the outskirts of a major metropolitan area. The region has seen better days and now new and old exist side by side as the District tries to survive.

CommerceStreet

In this overall view of the Southside Industrial District, the old time five and dime department store stands out in the background, lacking proper windows, signage, and details

I had been photographing my layout and the unfinished retail store in the middle of Commerce Street kept appearing as a big white blob in the background. I’ve known for some time that I wanted a modern dollar store to go in there, so now was the time to jump in and do it.

The model itself I’ve had for a while from a winning lot auction on eBay. I had to lookup the specific building and it turns out it is a “JC Nickles” from DPM. I has been sitting on the layout for several years now with side walls (mostly unseen) from what I think is a Gruesome Casket Co from IHM and a red sandpaper roof. I had already painted and lightly weathered the model to my liking.

DG02

The original DPM “J.C. Nickels” from an online auction lacking windows and detailing

The first step was to add glazing for the windows, which up until this point, had made the store front stand out and look incomplete. I found some clear plastic and sprayed one side with a matte finish to cloud up the windows. This makes them look dirty in the industrial setting, as well as hides the fact that the building is empty on the inside.

Next I searched the internet for signs for the type of business I wanted. I grabbed a few, as well as window signs and stickers, resized them for the appropriate space, and printed them out on a color printer with regular paper. I looked at real photos of stores and got signs that were typical. I even shrunk down the current week’s ad flyer! I simply affixed the posters to the back of the windows looking outward with white PVA glue that I knew would dry clear.

DG03

Signs captured from the internet and printed on a color printer. Printing several sizes of each sign gives some flexibility when it comes time to add the signage to the building

The main sign is mounted on a piece of styrene cut to fit and glued in place with super glue. The canopy is from a scrapped Tyco #7885 freight depot from the 1970’s (that was a good investment!). A slightly newer Suydam Purina Chow feed mill donated the roof vents.

As suspected, the yellow sign was too bright and dominated the background. I toned it down by smudging some black and white acrylic paints over it with my finger. I found a few figures and placed them on the sidewalk in front of the building to set the scene.

DG04 crop

The finished dollar store in place with details and figures. If you zoom in, you can even see the store hours on the front door window!

It was nice to have a straightforward project for once that was completed in a week of stress free modeling in the evenings. By identifying some easy wins I was able to gain some motivation to head down to the basement. I even had a couple of quick operating sessions to keep my skills fresh.

So, if you are having trouble making progress on your layout, find a quick and easy project that is fun to give you some momentum.