Lots of progress the last couple of days, mostly on the diorama. Subway station 8C is getting bulkheads, doors, a platform and track. The main bulkhead is corrugated cardboard with one paper side removed. Doors are sci-fi textures downloaded from the internet and glued to foam core. A few things left there to finish up.

The swamp is coming along, too. I touched up the bottom and believe the industrial piping to be done. I’m gathering scatter and junk to function as flotsam, and we’ll start gluing those down shortly.


The base coat is down on the layout, and next I’ll spay on a few coats from rattle cans to give the terrain some texture. The test on the diorama seemed to come out well. Track laying is imminent.




Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s