Archive for December, 2015


2015 Progress 1

Southside Industrial District in shadowbox relief.

When 2015 started, I had three major goals to achieve for my HO industrial switching layout.

  • Create a shadow box (or proscenium) arch valence for the front of the layout benchwork
  • Convert an old Athearn diesel switcher to battery powered radio control
  • Build a cardstock model of the UK Underground station at Morden

I am pleased to say I made major progress on two, while considering the proscenium arch completed. Scroll down through the blog to see construction articles. More on the London Underground coming in 2016!

The proscenium arch

Southside Arch

Full frontal industrial switching

Battery powered radio control switcher

2015 Progress 2

Southside Industrial SW1500 #703 works the Dupont plant on the edge of the District

Radio control installed and working, but still some work to do on the shell – hand rails and weathering.

Morden Underground Station (OO Scale)

2015 Progress 3

Morden Station on the Northern Line of the UK Underground

While the bulk of Morden station is complete, I’d say the entire diorama is maybe 40% complete. I still have detailing to do like street markings, figures and general clutter. I’m also going add a couple of levels below grade to show some underground passenger service.

Rather ambitious, but I hope to get it done with a little help from my friends.

Beatles test with Morden Station

Zebra crossing dress rehersal.